Habitats regulations assessment
Contents |
[edit] Overview
Habitats and species that are vulnerable, rare or threatened are protected by the European Union Habitats Directive. The Habitats Directive’s aim is to conserve habitats and wild species across Europe through the establishment of a network of sites which are known as the Natura 2000 sites.
Natura 2000 sites include:
- Special protection areas (SPAs).
- Special areas of conservation (SACs).
- Ramsar sites.
In the UK, the Habitats Directive is implemented through the Conservation of Habitats and Species Regulations 2010 (the “Habitats Regulations”).
Under the Habitats Regulations, a habitats regulations assessment is required where a plan or project is likely to have a significant effect on a Natura 2000 site. Each project or plan must consider likely effects either on its own, or in combination with other plans or projects.
[edit] Outline of an Habitats Regulations Assessment
A habitats regulations assessment is a detailed, precautionary process that is based on the conservation objectives of a site’s qualifying interests (the reason the site was designated). The main purpose is to ensure that there are no adverse effects on the Natura 2000 site. A habitats regulations assessment must be detailed and well recorded throughout.
[edit] Stages
The process involves four stages:
- Stage 1: Screening – the initial process which identifies the likely impacts of a plan or project on a Natura 2000 site. It considers whether the impacts are likely to be significant.
- Stage 2: Appropriate Assessment – if the screening stage has determined that proposals are likely to have a significant adverse impact on a Natura 2000 site, a more detailed assessment is required. If adverse effects are identified, an assessment of mitigation options is undertaken to determine the effects on the integrity of the site. If the mitigation options cannot avoid adverse effects, consent will only be granted if the next stages are followed.
- Stage 3: Assessment of alternative solutions – alternative methods of achieving the objectives of the plan or project are considered that avoid adverse impacts on the site.
- Stage 4: Assessment where no alternative solutions exist and where adverse impacts remain – assessment to determine if the plan or project is required for imperative reasons of overriding public interest (IROPI) and, if so, the compensatory measures that are required to offset any impacts on the site.
[edit] Related articles on Designing Buildings Wiki.
- Areas of Outstanding Natural Beauty.
- Biodiversity offsetting.
- Designated sites.
- Forests.
- National nature reserves.
- National parks.
- Natura 2000 network.
- Nature Conservation Order NCO.
- Natural England.
- Protected species.
- Ramsar sites.
- Sites of community importance.
- Sites of Special Scientific Interest.
- Special Area of Conservation.
- Special Protection Areas.
[edit] External references
Featured articles and news
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.